hyperpbi

Capital Project Controls

A clean project-controlling canvas modeled after the white-and-blue reference, with precise status cards and earned-value visuals.

Files

Playground

Load this example from the Dashboard Examples gallery, or import project.hyperpbi from the Playground home page. The bundle is local-first and contains no credentials or remote data.

Power BI

  1. Import the HyperPBI Core PBIVIZ package.
  2. Import data.csv as one table.
  3. Add every column to HyperPBI’s single Values field well. Keep the simple lowercase column names unchanged.
  4. Paste runtime.json into Runtime Configuration.
  5. Paste specification.json into Advanced JSON, validate, preview, and save.

All logical datasets use the portable powerbi source alias. The CSV has 22 fields, below the visual’s 50-field limit, and 18 rows, below the 30,000-row Power BI window.

Source fields

Expected behavior

Summary values use first-row semantics, monthly curves remain ordered, and cost composition traces back to cost-category rows.

Limitations

The example represents one selected project; use a report slicer or external filter to select other projects in Power BI.

All names, organizations, accounts, assets, and events are synthetic and provided only for product demonstration.